Meetings / Trial Results
Matamata RC @ Matamata Last updated 19/03/2019 4:50pm
Tuesday, 19 Mar 2019
Important Note:
NZTR uploads videos of trials on the same day as the trial meeting. If, for some reason a video is not available, we have to wait for Trackside to provide the footage. This generally takes 2-3 days.
NZTR uploads videos of trials on the same day as the trial meeting. If, for some reason a video is not available, we have to wait for Trackside to provide the footage. This generally takes 2-3 days.
-
Going
Good4 10.27 pm 03/04/22 -
Weather
Cloudy -
Rail
Out 17m | 5mm rain last 24 hours -
Track
Left hand
1628m -
Straight
300 Metres