Meetings / Trial Results
Riccarton Park - North Canterbury @ Rangiora Last updated 20/11/2018 3:16pm
Tuesday, 20 Nov 2018
Important Note:
NZTR uploads videos of trials on the same day as the trial meeting. If, for some reason a video is not available, we have to wait for Trackside to provide the footage. This generally takes 2-3 days.
NZTR uploads videos of trials on the same day as the trial meeting. If, for some reason a video is not available, we have to wait for Trackside to provide the footage. This generally takes 2-3 days.
-
Going
Soft5 10.27 pm 03/04/22 -
Weather
Fine -
Rail
Out 3m from 800m to 200m | 11mm rain last 24 hrs | 14mm rain last 7 days -
Track
Left hand
1764m -
Straight
250 Metres