Meetings / Trial Results
Riccarton Park - North Canterbury @ Rangiora Last updated 29/06/2018 4:01pm
Tuesday, 12 Jun 2018
Important Note:
NZTR uploads videos of trials on the same day as the trial meeting. If, for some reason a video is not available, we have to wait for Trackside to provide the footage. This generally takes 2-3 days.
NZTR uploads videos of trials on the same day as the trial meeting. If, for some reason a video is not available, we have to wait for Trackside to provide the footage. This generally takes 2-3 days.
-
Going
Heavy8 10.27 pm 03/04/22 -
Weather
Raining -
Rail
True | 2mm rain past 24/h, 50mm in the past 7 days -
Track
Left hand
1764m -
Straight
250 Metres