Meetings / Trial Results
Racing Rotorua @ Arawa Park Last updated 07/03/2017 4:24pm
Tuesday, 7 Mar 2017
Important Note:
NZTR uploads videos of trials on the same day as the trial meeting. If, for some reason a video is not available, we have to wait for Trackside to provide the footage. This generally takes 2-3 days.
NZTR uploads videos of trials on the same day as the trial meeting. If, for some reason a video is not available, we have to wait for Trackside to provide the footage. This generally takes 2-3 days.
-
Going
Good3 10.27 pm 03/04/22 -
Weather
Overcast -
Rail
Out 7m -
Track
Left hand
1600m -
Straight
300 Metres