Meetings / Trial Results
Riccarton Park - Canterbury JC @ Rangiora Last updated 13/06/2017 3:08pm
Tuesday, 13 Jun 2017
Important Note:
NZTR uploads videos of trials on the same day as the trial meeting. If, for some reason a video is not available, we have to wait for Trackside to provide the footage. This generally takes 2-3 days.
NZTR uploads videos of trials on the same day as the trial meeting. If, for some reason a video is not available, we have to wait for Trackside to provide the footage. This generally takes 2-3 days.
-
Going
Heavy9 10.27 pm 03/04/22 -
Weather
Cloudy -
Rail
True position -
Track
Left hand
1764m -
Straight
250 Metres