Meetings / Trial Results
Racing Rotorua @ Arawa Park Last updated 20/03/2015 2:18pm
Tuesday, 10 Mar 2015
Important Note:
NZTR uploads videos of trials on the same day as the trial meeting. If, for some reason a video is not available, we have to wait for Trackside to provide the footage. This generally takes 2-3 days.
NZTR uploads videos of trials on the same day as the trial meeting. If, for some reason a video is not available, we have to wait for Trackside to provide the footage. This generally takes 2-3 days.
-
Going
Soft5 10.27 pm 03/04/22 -
Weather
Fine -
Rail
Out 8m | 15mm rain on Saturday night -
Track
Left hand
1600m -
Straight
300 Metres