Meetings / Trial Results
Otaki-Maori RC @ Otaki Last updated 18/09/2012 2:19pm
Tuesday, 18 Sep 2012
Important Note:
NZTR uploads videos of trials on the same day as the trial meeting. If, for some reason a video is not available, we have to wait for Trackside to provide the footage. This generally takes 2-3 days.
NZTR uploads videos of trials on the same day as the trial meeting. If, for some reason a video is not available, we have to wait for Trackside to provide the footage. This generally takes 2-3 days.
-
Going
Heavy10 10.27 pm 03/04/22 -
Weather
Showery -
Rail
True position | 15mm rain last 24 hours -
Track
Left hand
1800m -
Straight
400 Metres