Meetings / Trial Results
Riccarton Park - Canterbury JC @ Motukarara Last updated 28/02/2012 2:28pm
Tuesday, 28 Feb 2012
Important Note:
NZTR uploads videos of trials on the same day as the trial meeting. If, for some reason a video is not available, we have to wait for Trackside to provide the footage. This generally takes 2-3 days.
NZTR uploads videos of trials on the same day as the trial meeting. If, for some reason a video is not available, we have to wait for Trackside to provide the footage. This generally takes 2-3 days.
-
Going
TBA -
Weather
TBA -
Rail
True position -
Track
Left hand
1800m -
Straight
400 Metres