Meetings / Trial Nominations
Racing Rotorua @ Arawa Park Last updated
Thursday, 20 Oct 2005
Important Note:
NZTR uploads videos of trials on the same day as the trial meeting. If, for some reason a video is not available, we have to wait for Trackside to provide the footage. This generally takes 2-3 days.
NZTR uploads videos of trials on the same day as the trial meeting. If, for some reason a video is not available, we have to wait for Trackside to provide the footage. This generally takes 2-3 days.
-
Going
TBA -
Weather
TBA -
Rail
TBA -
Track
Left hand
1600m -
Straight
300 Metres