Meetings / Trial Meeting incomplete
Paeroa R.C. @ Paeroa Last updated 23/12/2025 12:51pm
Tuesday, 21 Jun 2005
Important Note:
NZTR uploads videos of trials on the same day as the trial meeting. If, for some reason a video is not available, we have to wait for Trackside to provide the footage. This generally takes 2-3 days.
NZTR uploads videos of trials on the same day as the trial meeting. If, for some reason a video is not available, we have to wait for Trackside to provide the footage. This generally takes 2-3 days.
-
Going
Soft
-
Weather
Overcast
-
Rail
Out 7 metres -
Track
Right hand
1825m -
Straight
415 Metres
