Meetings / Trial Meeting incomplete
Riccarton Park - North Canterbury @ Rangiora Last updated 22/11/2024 2:41am
Tuesday, 14 Sep 2004
Important Note:
NZTR uploads videos of trials on the same day as the trial meeting. If, for some reason a video is not available, we have to wait for Trackside to provide the footage. This generally takes 2-3 days.
NZTR uploads videos of trials on the same day as the trial meeting. If, for some reason a video is not available, we have to wait for Trackside to provide the footage. This generally takes 2-3 days.
-
Going
TBA -
Weather
TBA -
Rail
True position -
Track
Left hand
1764m -
Straight
250 Metres