Meetings / Trial Nominations
Counties RC @ Pukekohe Park Last updated
Tuesday, 13 Jul 2004
Important Note:
NZTR uploads videos of trials on the same day as the trial meeting. If, for some reason a video is not available, we have to wait for Trackside to provide the footage. This generally takes 2-3 days.
NZTR uploads videos of trials on the same day as the trial meeting. If, for some reason a video is not available, we have to wait for Trackside to provide the footage. This generally takes 2-3 days.
-
Going
Heavy -
Weather
Fine -
Rail
3 metres -
Track
Right hand
1900m -
Straight
520 Metres