Meetings / Trial Meeting incomplete
Waipa RC @ Te Awamutu Last updated 26/12/2024 10:55pm
Tuesday, 9 Mar 2004
Important Note:
NZTR uploads videos of trials on the same day as the trial meeting. If, for some reason a video is not available, we have to wait for Trackside to provide the footage. This generally takes 2-3 days.
NZTR uploads videos of trials on the same day as the trial meeting. If, for some reason a video is not available, we have to wait for Trackside to provide the footage. This generally takes 2-3 days.
-
Going
Good -
Weather
Fine -
Rail
4 metres -
Track
Right hand
1650m -
Straight
300 Metres