Meetings / Trial Nominations
Riccarton Park - Canterbury JC @ Riccarton Park Last updated
Tuesday, 17 Feb 2004
Important Note:
NZTR uploads videos of trials on the same day as the trial meeting. If, for some reason a video is not available, we have to wait for Trackside to provide the footage. This generally takes 2-3 days.
NZTR uploads videos of trials on the same day as the trial meeting. If, for some reason a video is not available, we have to wait for Trackside to provide the footage. This generally takes 2-3 days.
-
Going
Soft 10.28 pm 03/04/22 -
Weather
Showery -
Rail
14 Metres -
Track
Left hand
2400m -
Straight
400 Metres