Meetings / Trial Meeting incomplete
Whangarei RC @ Ruakaka Last updated 23/11/2024 11:02pm
Monday, 13 Aug 2001
Important Note:
NZTR uploads videos of trials on the same day as the trial meeting. If, for some reason a video is not available, we have to wait for Trackside to provide the footage. This generally takes 2-3 days.
NZTR uploads videos of trials on the same day as the trial meeting. If, for some reason a video is not available, we have to wait for Trackside to provide the footage. This generally takes 2-3 days.
-
Going
Soft 10.28 pm 03/04/22 -
Weather
Fine -
Rail
TBA -
Track
Right hand
1800m -
Straight
400 Metres