Meetings / Trial Meeting incomplete
Wanganui Racehorse Owners Association Inc @ Wanganui Last updated 06/12/2025 5:03am
Tuesday, 28 Feb 1995
Important Note:
NZTR uploads videos of trials on the same day as the trial meeting. If, for some reason a video is not available, we have to wait for Trackside to provide the footage. This generally takes 2-3 days.
NZTR uploads videos of trials on the same day as the trial meeting. If, for some reason a video is not available, we have to wait for Trackside to provide the footage. This generally takes 2-3 days.
-
Going
Good
-
Weather
Fine
-
Rail
TBA -
Track
Left hand
1650m -
Straight
325 Metres
