Meetings / Trial Meeting incomplete
Taranaki Distr T.C. @ Stratford Last updated 05/12/2025 5:29pm
Thursday, 6 Apr 1995
Important Note:
NZTR uploads videos of trials on the same day as the trial meeting. If, for some reason a video is not available, we have to wait for Trackside to provide the footage. This generally takes 2-3 days.
NZTR uploads videos of trials on the same day as the trial meeting. If, for some reason a video is not available, we have to wait for Trackside to provide the footage. This generally takes 2-3 days.
-
Going
Heavy
-
Weather
Fine
-
Rail
TBA -
Track
Left hand
1600m -
Straight
400 Metres
