Meetings / Trial Meeting incomplete
Southland O. & T. Assn @ Riverton Last updated 05/12/2025 9:41pm
Sunday, 10 Sep 1995
Important Note:
NZTR uploads videos of trials on the same day as the trial meeting. If, for some reason a video is not available, we have to wait for Trackside to provide the footage. This generally takes 2-3 days.
NZTR uploads videos of trials on the same day as the trial meeting. If, for some reason a video is not available, we have to wait for Trackside to provide the footage. This generally takes 2-3 days.
-
Going
Heavy
-
Weather
Fine
-
Rail
TBA -
Track
Left hand
1650m -
Straight
400 Metres
