Meetings / Trial Meeting incomplete
Paeroa R.C. @ Paeroa Last updated 22/11/2024 11:18pm
Friday, 28 Apr 2000
Important Note:
NZTR uploads videos of trials on the same day as the trial meeting. If, for some reason a video is not available, we have to wait for Trackside to provide the footage. This generally takes 2-3 days.
NZTR uploads videos of trials on the same day as the trial meeting. If, for some reason a video is not available, we have to wait for Trackside to provide the footage. This generally takes 2-3 days.
-
Going
TBA -
Weather
TBA -
Rail
TBA -
Track
Right hand
1825m -
Straight
415 Metres