Meetings / Trial Meeting incomplete
Matamata RC @ Matamata Last updated 22/12/2024 7:16pm
Thursday, 6 Apr 1995
Important Note:
NZTR uploads videos of trials on the same day as the trial meeting. If, for some reason a video is not available, we have to wait for Trackside to provide the footage. This generally takes 2-3 days.
NZTR uploads videos of trials on the same day as the trial meeting. If, for some reason a video is not available, we have to wait for Trackside to provide the footage. This generally takes 2-3 days.
-
Going
Soft 10.28 pm 03/04/22 -
Weather
Fine -
Rail
TBA -
Track
Left hand
1628m -
Straight
300 Metres