Meetings / Trial Nominations
Matamata RC @ Matamata Last updated
Wednesday, 21 Jan 2026
Important Note:
NZTR uploads videos of trials on the same day as the trial meeting. If, for some reason a video is not available, we have to wait for Trackside to provide the footage. This generally takes 2-3 days.
NZTR uploads videos of trials on the same day as the trial meeting. If, for some reason a video is not available, we have to wait for Trackside to provide the footage. This generally takes 2-3 days.
-
Going
Soft7 8.28 am 16/01/26
-
Weather
Cloudy
-
Rail
Out 5m | 34mm Rain Last 24 Hours | 34mm Rain Last 7 Days | 10mm Irrigation Last 24 Hours -
Track
Left hand
1628m -
Straight
300 Metres
