Meetings / Trial Results
Riccarton Park - North Canterbury @ Rangiora Last updated 09/09/2021 10:49am
Tuesday, 7 Sep 2021
Important Note:
NZTR uploads videos of trials on the same day as the trial meeting. If, for some reason a video is not available, we have to wait for Trackside to provide the footage. This generally takes 2-3 days.
NZTR uploads videos of trials on the same day as the trial meeting. If, for some reason a video is not available, we have to wait for Trackside to provide the footage. This generally takes 2-3 days.
-
Going
Good4 10.27 pm 03/04/22 -
Weather
Fine -
Rail
True | 15mm Rain Last 7 Days -
Track
Left hand
1764m -
Straight
250 Metres