Meetings / Trial Results
Riccarton Park - North Canterbury @ Rangiora Last updated 07/10/2019 4:24pm
Tuesday, 24 Sep 2019
Important Note:
NZTR uploads videos of trials on the same day as the trial meeting. If, for some reason a video is not available, we have to wait for Trackside to provide the footage. This generally takes 2-3 days.
NZTR uploads videos of trials on the same day as the trial meeting. If, for some reason a video is not available, we have to wait for Trackside to provide the footage. This generally takes 2-3 days.
-
Going
Firm2 10.27 pm 03/04/22 -
Weather
Cloudy -
Rail
True | No Rain Last 7 Days -
Track
Left hand
1764m -
Straight
250 Metres