Meetings / Trial Results
Matamata RC @ Matamata Last updated 08/01/2019 7:33am
Tuesday, 27 Nov 2018
Important Note:
NZTR uploads videos of trials on the same day as the trial meeting. If, for some reason a video is not available, we have to wait for Trackside to provide the footage. This generally takes 2-3 days.
NZTR uploads videos of trials on the same day as the trial meeting. If, for some reason a video is not available, we have to wait for Trackside to provide the footage. This generally takes 2-3 days.
-
Going
Heavy9 10.27 pm 03/04/22 -
Weather
Cloudy -
Rail
Out 16m | 19mm rain overnight -
Track
Left hand
1628m -
Straight
300 Metres