Meetings / Trial Results
Riccarton Park - North Canterbury @ Rangiora Last updated 16/09/2014 2:18pm
Tuesday, 26 Aug 2014
Important Note:
NZTR uploads videos of trials on the same day as the trial meeting. If, for some reason a video is not available, we have to wait for Trackside to provide the footage. This generally takes 2-3 days.
NZTR uploads videos of trials on the same day as the trial meeting. If, for some reason a video is not available, we have to wait for Trackside to provide the footage. This generally takes 2-3 days.
-
Going
Good3 10.27 pm 03/04/22 -
Weather
Overcast -
Rail
Out 3m 1200m-250m -
Track
Left hand
1764m -
Straight
250 Metres