Meetings / Trial Results
Racing Rotorua @ Arawa Park Last updated 11/03/2014 4:39pm
Tuesday, 11 Mar 2014
Important Note:
NZTR uploads videos of trials on the same day as the trial meeting. If, for some reason a video is not available, we have to wait for Trackside to provide the footage. This generally takes 2-3 days.
NZTR uploads videos of trials on the same day as the trial meeting. If, for some reason a video is not available, we have to wait for Trackside to provide the footage. This generally takes 2-3 days.
-
Going
Good4 10.27 pm 03/04/22 -
Weather
Fine -
Rail
Out 8m -
Track
Left hand
1600m -
Straight
300 Metres