Meetings / Trial Results
Waikato RC @ Paeroa Last updated 28/11/2013 1:19pm
Tuesday, 26 Nov 2013
Important Note:
NZTR uploads videos of trials on the same day as the trial meeting. If, for some reason a video is not available, we have to wait for Trackside to provide the footage. This generally takes 2-3 days.
NZTR uploads videos of trials on the same day as the trial meeting. If, for some reason a video is not available, we have to wait for Trackside to provide the footage. This generally takes 2-3 days.
-
Going
Good4 10.27 pm 03/04/22 -
Weather
Fine -
Rail
Out 4m | 1mm rain overnight -
Track
Right hand
1825m -
Straight
415 Metres