Meetings / Trial Results
Riccarton Park - Canterbury JC @ Motukarara Last updated 07/11/2013 5:05pm
Thursday, 7 Nov 2013
Important Note:
NZTR uploads videos of trials on the same day as the trial meeting. If, for some reason a video is not available, we have to wait for Trackside to provide the footage. This generally takes 2-3 days.
NZTR uploads videos of trials on the same day as the trial meeting. If, for some reason a video is not available, we have to wait for Trackside to provide the footage. This generally takes 2-3 days.
-
Going
Good3 10.27 pm 03/04/22 -
Weather
Fine -
Rail
True position -
Track
Left hand
1800m -
Straight
400 Metres