Meetings / Trial Results
Auckland RC @ Ellerslie Last updated 07/11/2013 5:05pm
Thursday, 7 Nov 2013
Important Note:
NZTR uploads videos of trials on the same day as the trial meeting. If, for some reason a video is not available, we have to wait for Trackside to provide the footage. This generally takes 2-3 days.
NZTR uploads videos of trials on the same day as the trial meeting. If, for some reason a video is not available, we have to wait for Trackside to provide the footage. This generally takes 2-3 days.
-
Going
Good4 10.27 pm 03/04/22 -
Weather
Showery -
Rail
Inside Track| 4mm rain overnight -
Track
Right hand
1876m -
Straight
382 Metres