Meetings / Trial Results
Waikato RC @ Paeroa Last updated 03/09/2012 9:34am
Tuesday, 28 Aug 2012
Important Note:
NZTR uploads videos of trials on the same day as the trial meeting. If, for some reason a video is not available, we have to wait for Trackside to provide the footage. This generally takes 2-3 days.
NZTR uploads videos of trials on the same day as the trial meeting. If, for some reason a video is not available, we have to wait for Trackside to provide the footage. This generally takes 2-3 days.
-
Going
Heavy10 10.31 pm 03/04/22 -
Weather
Fine -
Rail
Out 4m -
Track
Right hand
1825m -
Straight
415 Metres