Meetings / Trial Results
Otago RC @ Wingatui Last updated 14/03/2012 1:21pm
Wednesday, 14 Mar 2012
Important Note:
NZTR uploads videos of trials on the same day as the trial meeting. If, for some reason a video is not available, we have to wait for Trackside to provide the footage. This generally takes 2-3 days.
NZTR uploads videos of trials on the same day as the trial meeting. If, for some reason a video is not available, we have to wait for Trackside to provide the footage. This generally takes 2-3 days.
-
Going
Soft 12.44 pm 13/03/12 -
Weather
Fine -
Rail
True position -
Track
Left hand
2000m -
Straight
350 Metres