Meetings / Trial Results
Riccarton Park - Canterbury JC @ Rangiora Last updated 15/11/2011 3:26pm
Tuesday, 15 Nov 2011
Important Note:
NZTR uploads videos of trials on the same day as the trial meeting. If, for some reason a video is not available, we have to wait for Trackside to provide the footage. This generally takes 2-3 days.
NZTR uploads videos of trials on the same day as the trial meeting. If, for some reason a video is not available, we have to wait for Trackside to provide the footage. This generally takes 2-3 days.
-
Going
Soft 10.28 pm 03/04/22 -
Weather
Fine -
Rail
Out 3 Metres 1200-300m -
Track
Left hand
1764m -
Straight
250 Metres