Meetings / Trial Nominations
Racing Rotorua @ Arawa Park Last updated
Tuesday, 28 Jun 2005
Important Note:
NZTR uploads videos of trials on the same day as the trial meeting. If, for some reason a video is not available, we have to wait for Trackside to provide the footage. This generally takes 2-3 days.
NZTR uploads videos of trials on the same day as the trial meeting. If, for some reason a video is not available, we have to wait for Trackside to provide the footage. This generally takes 2-3 days.
-
Going
Soft -
Weather
Fine -
Rail
9 Metres -
Track
Left hand
1600m -
Straight
300 Metres