Meetings / Trial Meeting incomplete
Waipa RC @ Te Awamutu Last updated 24/12/2024 4:44pm
Tuesday, 14 Jun 2005
Important Note:
NZTR uploads videos of trials on the same day as the trial meeting. If, for some reason a video is not available, we have to wait for Trackside to provide the footage. This generally takes 2-3 days.
NZTR uploads videos of trials on the same day as the trial meeting. If, for some reason a video is not available, we have to wait for Trackside to provide the footage. This generally takes 2-3 days.
-
Going
Soft -
Weather
Fine -
Rail
Out 7 Metres -
Track
Right hand
1650m -
Straight
300 Metres