Meetings / Trial Nominations
Manawatu O. & T. Assn @ Wanganui Last updated
Wednesday, 27 Oct 2004
Important Note:
NZTR uploads videos of trials on the same day as the trial meeting. If, for some reason a video is not available, we have to wait for Trackside to provide the footage. This generally takes 2-3 days.
NZTR uploads videos of trials on the same day as the trial meeting. If, for some reason a video is not available, we have to wait for Trackside to provide the footage. This generally takes 2-3 days.
-
Going
Soft 10.28 pm 03/04/22 -
Weather
Cloudy -
Rail
True position -
Track
Left hand
1650m -
Straight
325 Metres