Meetings / Trial Nominations
Paeroa R.C. @ Paeroa Last updated
Thursday, 14 Oct 2004
Important Note:
NZTR uploads videos of trials on the same day as the trial meeting. If, for some reason a video is not available, we have to wait for Trackside to provide the footage. This generally takes 2-3 days.
NZTR uploads videos of trials on the same day as the trial meeting. If, for some reason a video is not available, we have to wait for Trackside to provide the footage. This generally takes 2-3 days.
-
Going
Soft 10.28 pm 03/04/22 -
Weather
Cloudy -
Rail
4 metres -
Track
Right hand
1825m -
Straight
415 Metres