Meetings / Trial Nominations
Riccarton Park - North Canterbury @ Rangiora Last updated
Thursday, 4 Mar 2004
Important Note:
NZTR uploads videos of trials on the same day as the trial meeting. If, for some reason a video is not available, we have to wait for Trackside to provide the footage. This generally takes 2-3 days.
NZTR uploads videos of trials on the same day as the trial meeting. If, for some reason a video is not available, we have to wait for Trackside to provide the footage. This generally takes 2-3 days.
-
Going
Good -
Weather
Overcast -
Rail
True position -
Track
Left hand
1764m -
Straight
250 Metres