Meetings / Trial Meeting incomplete
Counties RC @ Pukekohe Park Last updated 05/12/2025 5:26pm
Monday, 22 Dec 2003
Important Note:
NZTR uploads videos of trials on the same day as the trial meeting. If, for some reason a video is not available, we have to wait for Trackside to provide the footage. This generally takes 2-3 days.
NZTR uploads videos of trials on the same day as the trial meeting. If, for some reason a video is not available, we have to wait for Trackside to provide the footage. This generally takes 2-3 days.
-
Going
Good
-
Weather
Overcast
-
Rail
True position -
Track
Right hand
1900m -
Straight
520 Metres
