Meetings / Trial Meeting incomplete
Manawatu O. & T. Assn @ Woodville Last updated 22/12/2024 6:50pm
Tuesday, 25 Nov 2003
Important Note:
NZTR uploads videos of trials on the same day as the trial meeting. If, for some reason a video is not available, we have to wait for Trackside to provide the footage. This generally takes 2-3 days.
NZTR uploads videos of trials on the same day as the trial meeting. If, for some reason a video is not available, we have to wait for Trackside to provide the footage. This generally takes 2-3 days.
-
Going
Good -
Weather
Fine -
Rail
True position -
Track
Left hand
1800m -
Straight
375 Metres