Meetings / Trial Meeting incomplete
Southland O. & T. Assn @ Wyndham Last updated 06/12/2025 3:23am
Friday, 18 Oct 1996
Important Note:
NZTR uploads videos of trials on the same day as the trial meeting. If, for some reason a video is not available, we have to wait for Trackside to provide the footage. This generally takes 2-3 days.
NZTR uploads videos of trials on the same day as the trial meeting. If, for some reason a video is not available, we have to wait for Trackside to provide the footage. This generally takes 2-3 days.
-
Going
Soft
-
Weather
Fine
-
Rail
TBA -
Track
Left hand
1600m -
Straight
300 Metres
