Meetings / Trial Meeting incomplete
Southland O. & T. Assn @ Winton Last updated 04/12/2024 7:24am
Saturday, 30 Oct 1993
Important Note:
NZTR uploads videos of trials on the same day as the trial meeting. If, for some reason a video is not available, we have to wait for Trackside to provide the footage. This generally takes 2-3 days.
NZTR uploads videos of trials on the same day as the trial meeting. If, for some reason a video is not available, we have to wait for Trackside to provide the footage. This generally takes 2-3 days.
-
Going
Good -
Weather
Fine -
Rail
TBA -
Track
Left hand
1786m -
Straight
270 Metres