Meetings / Trial Meeting incomplete
Wanganui Racehorse Owners Association Inc @ Waverley Last updated 23/11/2024 11:07pm
Tuesday, 7 Dec 1999
Important Note:
NZTR uploads videos of trials on the same day as the trial meeting. If, for some reason a video is not available, we have to wait for Trackside to provide the footage. This generally takes 2-3 days.
NZTR uploads videos of trials on the same day as the trial meeting. If, for some reason a video is not available, we have to wait for Trackside to provide the footage. This generally takes 2-3 days.
-
Going
Good -
Weather
Fine -
Rail
TBA -
Track
Left hand
1800m -
Straight
375 Metres