Meetings / Trial Meeting incomplete
Racing Rotorua @ Arawa Park Last updated 24/12/2024 4:47pm
Friday, 5 Nov 1993
Important Note:
NZTR uploads videos of trials on the same day as the trial meeting. If, for some reason a video is not available, we have to wait for Trackside to provide the footage. This generally takes 2-3 days.
NZTR uploads videos of trials on the same day as the trial meeting. If, for some reason a video is not available, we have to wait for Trackside to provide the footage. This generally takes 2-3 days.
-
Going
Good -
Weather
Fine -
Rail
TBA -
Track
Left hand
1600m -
Straight
300 Metres