Meetings / Trial Meeting incomplete
Racing Rotorua @ Arawa Park Last updated 03/01/2025 4:22pm
Thursday, 3 Jul 2003
Important Note:
NZTR uploads videos of trials on the same day as the trial meeting. If, for some reason a video is not available, we have to wait for Trackside to provide the footage. This generally takes 2-3 days.
NZTR uploads videos of trials on the same day as the trial meeting. If, for some reason a video is not available, we have to wait for Trackside to provide the footage. This generally takes 2-3 days.
-
Going
Heavy -
Weather
Fine -
Rail
TBA -
Track
Left hand
1600m -
Straight
300 Metres