Meetings / Trial Meeting incomplete
Southland O. & T. Assn @ Riverton Last updated 31/12/2024 8:44am
Saturday, 30 Nov 1996
Important Note:
NZTR uploads videos of trials on the same day as the trial meeting. If, for some reason a video is not available, we have to wait for Trackside to provide the footage. This generally takes 2-3 days.
NZTR uploads videos of trials on the same day as the trial meeting. If, for some reason a video is not available, we have to wait for Trackside to provide the footage. This generally takes 2-3 days.
-
Going
Heavy -
Weather
Fine -
Rail
TBA -
Track
Left hand
1650m -
Straight
400 Metres