Meetings / Trial Meeting incomplete
Paeroa R.C. @ Paeroa Last updated 05/12/2025 5:26pm
Tuesday, 25 Feb 2003
Important Note:
NZTR uploads videos of trials on the same day as the trial meeting. If, for some reason a video is not available, we have to wait for Trackside to provide the footage. This generally takes 2-3 days.
NZTR uploads videos of trials on the same day as the trial meeting. If, for some reason a video is not available, we have to wait for Trackside to provide the footage. This generally takes 2-3 days.
-
Going
Soft 10.28 pm 03/04/22
-
Weather
TBA -
Rail
TBA -
Track
Right hand
1825m -
Straight
415 Metres
