Meetings / Trial Meeting incomplete
Paeroa R.C. @ Paeroa Last updated 04/12/2024 7:29am
Thursday, 7 Jun 2001
Important Note:
NZTR uploads videos of trials on the same day as the trial meeting. If, for some reason a video is not available, we have to wait for Trackside to provide the footage. This generally takes 2-3 days.
NZTR uploads videos of trials on the same day as the trial meeting. If, for some reason a video is not available, we have to wait for Trackside to provide the footage. This generally takes 2-3 days.
-
Going
Heavy -
Weather
Fine -
Rail
TBA -
Track
Right hand
1825m -
Straight
415 Metres