Meetings / Trial Meeting incomplete
Paeroa R.C. @ Paeroa Last updated 03/02/2025 2:02am
Monday, 13 Oct 1997
Important Note:
NZTR uploads videos of trials on the same day as the trial meeting. If, for some reason a video is not available, we have to wait for Trackside to provide the footage. This generally takes 2-3 days.
NZTR uploads videos of trials on the same day as the trial meeting. If, for some reason a video is not available, we have to wait for Trackside to provide the footage. This generally takes 2-3 days.
-
Going
Soft -
Weather
Fine -
Rail
TBA -
Track
Right hand
1825m -
Straight
415 Metres