Meetings / Trial Meeting incomplete
Otago O. & T. Assn @ Wingatui Last updated 22/11/2024 2:52am
Sunday, 28 Nov 1993
Important Note:
NZTR uploads videos of trials on the same day as the trial meeting. If, for some reason a video is not available, we have to wait for Trackside to provide the footage. This generally takes 2-3 days.
NZTR uploads videos of trials on the same day as the trial meeting. If, for some reason a video is not available, we have to wait for Trackside to provide the footage. This generally takes 2-3 days.
-
Going
Good -
Weather
Fine -
Rail
TBA -
Track
Left hand
2000m -
Straight
350 Metres