Meetings / Trial Meeting incomplete
Otago O. & T. Assn @ Wingatui Last updated 28/12/2024 6:40am
Sunday, 13 Oct 2002
Important Note:
NZTR uploads videos of trials on the same day as the trial meeting. If, for some reason a video is not available, we have to wait for Trackside to provide the footage. This generally takes 2-3 days.
NZTR uploads videos of trials on the same day as the trial meeting. If, for some reason a video is not available, we have to wait for Trackside to provide the footage. This generally takes 2-3 days.
-
Going
Soft 10.28 pm 03/04/22 -
Weather
Showery -
Rail
TBA -
Track
Left hand
2000m -
Straight
350 Metres